{"id":16584,"date":"2012-11-28T22:14:05","date_gmt":"2012-11-28T21:14:05","guid":{"rendered":"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/"},"modified":"2012-11-28T22:14:05","modified_gmt":"2012-11-28T21:14:05","slug":"teknologiske-kontrakter-innen-smakraft","status":"publish","type":"arkiv","link":"https:\/\/oneco-test.simplylearn.dev\/en\/arkiv\/teknologiske-kontrakter-innen-smakraft\/","title":{"rendered":"Technology contracts in small power"},"content":{"rendered":"<p class=\"lead\"><strong>OneCo West's Energy department has recently won several exciting and technologically demanding contracts for the delivery of automation and electrical solutions for small power plants. Holsfossen Power StationHolsfossen Power Station is owned and operated by Eidsiva Vannkraft AS.<\/strong><\/p>\n<p>OneCo West's Energy department has recently won several exciting and technologically demanding contracts for the delivery of automation and electrical solutions for small power plants.<\/p>\n<p><strong>Holsfossen power station<br \/>\n<\/strong>Holsfossen Power Station is owned and operated by Eidsiva Vannkraft AS.<br \/>\nThe power plant utilises a drop of 23.9 m in Holsfossen. The existing plant was built in 1913-1914 and was last remodelled in 1930. Today, the power plant appears very worn and unreliable, and Eidsiva Vannkraft AS wanted to carry out a complete renovation of Holsfossen power plant.<br \/>\nThe refurbishment plan includes a new intake, replacement and increase in the dimension of the inlet pipe, new mechanical and electrical equipment and a new power station building. Of the existing power plant, only the threshold dam will be retained.<br \/>\nHolsfossen power station is located in Gausdal municipality, about 20 kilometres north of Lillehammer.<br \/>\nThe plant consists of 1x2500kVA Kaplan turbine with associated 690V, 2500kVA synchronous generator.<\/p>\n<p>The scope of delivery for OneCo includes the control system, 22kV appliance system, substation and generator transformer, auxiliary system, HS\/LS installation and commissioning of the system. It must be possible to operate the plant from an external control centre via the IEC-60870-5-104 protocol. Commissioning of the plant is planned for autumn 2013.<\/p>\n<p><strong>New Haukeland Power Station<\/strong><br \/>\nThe new Haukland power station is located in Moi in Lund municipality, Rogaland county. The power station's intake reservoir, where the intake pipe starts, is called Stemmevatn. The end customer is Dalane Kraft AS.<br \/>\nThe plant consists of 1 x 5500kVA Francis turbine with 1 x 6.6kV synchronous generator that can be regulated for island operation.<\/p>\n<p>In addition to automation and installation, the scope of delivery for OneCo also includes complete installation of lighting and heating in the substation and delivery of a new main transformer. It will also be possible to operate the plant from a remote control centre via the IEC-60870-5-104 protocol.  Commissioning of the plant is planned for autumn 2013.<\/p>\n<p><strong>Storelvvatn Power Station<\/strong><br \/>\nA new Storelvvatnet power station will be built in Fauske municipality. The contractor is SKS Produksjon AS. Storelvvatnet power plant will utilise the catchment areas for the Rupsi and Storelvvatnet intake reservoirs, as well as a smaller stream intake, all of which are included in the licence for Lomi power plant. The plant consists of 1x5000kVA Francis turbine with 6.6kV synchronous generator<\/p>\n<p>The scope of delivery for OneCo includes a control system, 24kV appliance system, complete 110VDC auxiliary system, main earth, installation, station and generator transformer, distribution boards. The system must also be able to be operated from a remote control centre via IEC-60870-5-104 protocol.  Commissioning of the plant is planned for autumn 2013.<\/p>","protected":false},"excerpt":{"rendered":"<p>OneCo West's Energy department has recently won several exciting and technologically demanding contracts for the delivery of automation and electrical solutions for small power plants. Holsfossen Power StationHolsfossen Power Station is owned and operated by Eidsiva Vannkraft AS.<\/p>","protected":false},"featured_media":16298,"parent":0,"template":"","categories":[326,319],"class_list":["post-16584","arkiv","type-arkiv","status-publish","has-post-thumbnail","hentry","category-326","category-aktuelt"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.7 (Yoast SEO v25.9) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Teknologiske kontrakter innen sm\u00e5kraft - OneCo<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/oneco-test.simplylearn.dev\/en\/arkiv\/teknologiske-kontrakter-innen-smakraft\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Teknologiske kontrakter innen sm\u00e5kraft\" \/>\n<meta property=\"og:description\" content=\"OneCo Vests avd. Energi har den siste tiden vunnet flere spennende og teknologisk tunge kontrakter p\u00e5 leveranse av automasjons- og elektrol\u00f8sninger til sm\u00e5kraftverk. Holsfossen KraftverkHolsfossen Kraftverk eies og driftes av Eidsiva Vannkraft AS.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/oneco-test.simplylearn.dev\/en\/arkiv\/teknologiske-kontrakter-innen-smakraft\/\" \/>\n<meta property=\"og:site_name\" content=\"OneCo\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/OneCoNorge\" \/>\n<meta property=\"og:image\" content=\"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2025\/01\/Teknologiske-kontrakter-innen-smakraft.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"850\" \/>\n\t<meta property=\"og:image:height\" content=\"565\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/\",\"url\":\"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/\",\"name\":\"Teknologiske kontrakter innen sm\u00e5kraft - OneCo\",\"isPartOf\":{\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2025\/01\/Teknologiske-kontrakter-innen-smakraft.jpg\",\"datePublished\":\"2012-11-28T21:14:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#primaryimage\",\"url\":\"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2025\/01\/Teknologiske-kontrakter-innen-smakraft.jpg\",\"contentUrl\":\"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2025\/01\/Teknologiske-kontrakter-innen-smakraft.jpg\",\"width\":850,\"height\":565},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Hjem\",\"item\":\"https:\/\/oneco-test.simplylearn.dev\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Teknologiske kontrakter innen sm\u00e5kraft\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/#website\",\"url\":\"https:\/\/oneco-test.simplylearn.dev\/\",\"name\":\"OneCo.no\",\"description\":\"\u00abKompetanse for sikker og robust infrastruktur\u00bb\",\"publisher\":{\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/oneco-test.simplylearn.dev\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/#organization\",\"name\":\"OneCo\",\"url\":\"https:\/\/oneco-test.simplylearn.dev\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2024\/10\/OneCo_logo_vertikal_lilla.svg\",\"contentUrl\":\"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2024\/10\/OneCo_logo_vertikal_lilla.svg\",\"width\":427,\"height\":378,\"caption\":\"OneCo\"},\"image\":{\"@id\":\"https:\/\/oneco-test.simplylearn.dev\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/OneCoNorge\",\"https:\/\/www.youtube.com\/@onecovideo8262\",\"https:\/\/www.linkedin.com\/company\/2390899\/\"],\"publishingPrinciples\":\"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/\",\"ownershipFundingInfo\":\"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/\",\"actionableFeedbackPolicy\":\"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/varsle-oss\/\",\"correctionsPolicy\":\"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/vare-verdier-og-etiske-retningslinjer\/\",\"ethicsPolicy\":\"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/vare-verdier-og-etiske-retningslinjer\/\",\"diversityPolicy\":\"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/vare-verdier-og-etiske-retningslinjer\/\",\"diversityStaffingReport\":\"https:\/\/oneco-test.simplylearn.dev\/karriere\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Teknologiske kontrakter innen sm\u00e5kraft - OneCo","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/oneco-test.simplylearn.dev\/en\/arkiv\/teknologiske-kontrakter-innen-smakraft\/","og_locale":"en_GB","og_type":"article","og_title":"Teknologiske kontrakter innen sm\u00e5kraft","og_description":"OneCo Vests avd. Energi har den siste tiden vunnet flere spennende og teknologisk tunge kontrakter p\u00e5 leveranse av automasjons- og elektrol\u00f8sninger til sm\u00e5kraftverk. Holsfossen KraftverkHolsfossen Kraftverk eies og driftes av Eidsiva Vannkraft AS.","og_url":"https:\/\/oneco-test.simplylearn.dev\/en\/arkiv\/teknologiske-kontrakter-innen-smakraft\/","og_site_name":"OneCo","article_publisher":"https:\/\/www.facebook.com\/OneCoNorge","og_image":[{"width":850,"height":565,"url":"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2025\/01\/Teknologiske-kontrakter-innen-smakraft.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/","url":"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/","name":"Teknologiske kontrakter innen sm\u00e5kraft - OneCo","isPartOf":{"@id":"https:\/\/oneco-test.simplylearn.dev\/#website"},"primaryImageOfPage":{"@id":"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#primaryimage"},"image":{"@id":"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#primaryimage"},"thumbnailUrl":"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2025\/01\/Teknologiske-kontrakter-innen-smakraft.jpg","datePublished":"2012-11-28T21:14:05+00:00","breadcrumb":{"@id":"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#primaryimage","url":"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2025\/01\/Teknologiske-kontrakter-innen-smakraft.jpg","contentUrl":"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2025\/01\/Teknologiske-kontrakter-innen-smakraft.jpg","width":850,"height":565},{"@type":"BreadcrumbList","@id":"https:\/\/oneco-test.simplylearn.dev\/arkiv\/teknologiske-kontrakter-innen-smakraft\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Hjem","item":"https:\/\/oneco-test.simplylearn.dev\/"},{"@type":"ListItem","position":2,"name":"Teknologiske kontrakter innen sm\u00e5kraft"}]},{"@type":"WebSite","@id":"https:\/\/oneco-test.simplylearn.dev\/#website","url":"https:\/\/oneco-test.simplylearn.dev\/","name":"OneCo.no","description":"\"Expertise for secure and robust infrastructure\"","publisher":{"@id":"https:\/\/oneco-test.simplylearn.dev\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/oneco-test.simplylearn.dev\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/oneco-test.simplylearn.dev\/#organization","name":"OneCo","url":"https:\/\/oneco-test.simplylearn.dev\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/oneco-test.simplylearn.dev\/#\/schema\/logo\/image\/","url":"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2024\/10\/OneCo_logo_vertikal_lilla.svg","contentUrl":"https:\/\/oneco-test.simplylearn.dev\/wp-content\/uploads\/2024\/10\/OneCo_logo_vertikal_lilla.svg","width":427,"height":378,"caption":"OneCo"},"image":{"@id":"https:\/\/oneco-test.simplylearn.dev\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/OneCoNorge","https:\/\/www.youtube.com\/@onecovideo8262","https:\/\/www.linkedin.com\/company\/2390899\/"],"publishingPrinciples":"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/","ownershipFundingInfo":"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/","actionableFeedbackPolicy":"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/varsle-oss\/","correctionsPolicy":"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/vare-verdier-og-etiske-retningslinjer\/","ethicsPolicy":"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/vare-verdier-og-etiske-retningslinjer\/","diversityPolicy":"https:\/\/oneco-test.simplylearn.dev\/hvem-vi-er\/vare-verdier-og-etiske-retningslinjer\/","diversityStaffingReport":"https:\/\/oneco-test.simplylearn.dev\/karriere\/"}]}},"_links":{"self":[{"href":"https:\/\/oneco-test.simplylearn.dev\/en\/wp-json\/wp\/v2\/arkiv\/16584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/oneco-test.simplylearn.dev\/en\/wp-json\/wp\/v2\/arkiv"}],"about":[{"href":"https:\/\/oneco-test.simplylearn.dev\/en\/wp-json\/wp\/v2\/types\/arkiv"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/oneco-test.simplylearn.dev\/en\/wp-json\/wp\/v2\/media\/16298"}],"wp:attachment":[{"href":"https:\/\/oneco-test.simplylearn.dev\/en\/wp-json\/wp\/v2\/media?parent=16584"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/oneco-test.simplylearn.dev\/en\/wp-json\/wp\/v2\/categories?post=16584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}